top of page
KOW Building Consultants_0827-BW.jpg

Electrical Resistivity

Electrical resistivity testing, formally referred to as the 4-Point Wenner Array, determines the level of conductivity present in a measured quantity of soil.
Resistivity results are measured in ohm-meter or ohm-centimeter and are crucial when designing electrical grounding elements during a project.

bottom of page