top of page
KOW Building Consultants_0827-BW.jpg

Energielabel (Energy Label)

An Energielabel is a label that is required by European Union regulations to be displayed on certain products, such as appliances, vehicles, and buildings. The label indicates the energy efficiency of the product, with a higher rating indicating that the product is more energy-efficient.

bottom of page