top of page
KOW Building Consultants_0827-BW.jpg

Geotechnical Review

A Geologic or Geotechnical Review is the reviewing of available data about a soil and rock conditions on a property such as engineering and architectural documents, geologic maps, soil maps, aerial photographs, topographic maps, geologic hazard maps, etc.

bottom of page