top of page
KOW Building Consultants_0827-BW.jpg

High albedo

High albedo materials reflect more sunlight, reducing heat absorption and lowering cooling costs. Used on roofs and pavements, high albedo materials contribute to energy efficiency and mitigate the urban heat island effect.

bottom of page