top of page
Immediate Repairs Table
The Immediate Repairs Table is one of two tables included in a Property Condition Report, which identifies short-term capital needs (recommended within the next 90 days), deferred maintenance and all failing or damaged building systems and life safety issues, as well as opinions of probable costs to correct the items identified. The Immediate Repairs Table highlights items that require immediate action due to existing or potential unsafe conditions, building code or fire code violations, or conditions that if left uncorrected could result in critical failure or significant costs. Examples of immediate repairs include a lack of fire extinguishers, a failing roof system, or structural damage.
bottom of page