top of page
Lead Risk Assessment
Lead risk assessments are evaluations that are conducted by certified lead risk assessors in order to identify lead hazards. Lead hazards can vary and can include: deteriorated paint, lead in dust, lead in soil, and lead in drinking water. Lead risk assessments may consist of dust testing, lead in water testing, and/or analyzing for lead in soil, deteriorated paint and other deteriorated coatings.
bottom of page