top of page
KOW Building Consultants_0827-BW.jpg

Scenario Expected Loss (SEL)

The Scenario Expected Loss (SEL), is one way to express the Probable Maximum Loss value. The Scenario Expected Loss is the expected average damage of a buidling during a seismic event. Another way to express the PML value is the Scenario Upper Loss (SUL).

bottom of page