top of page
KOW Building Consultants_0827-BW.jpg

Sick Building Syndrome

As defined by the EPA “The term ‘Sick Building Syndrome’ (SBS) is used to describe situations in which building occupants experience acute health and comfort effects that appear to be linked to time spent in a building, but no specific illness or cause can be identified. The complaints may be localized in a particular room or zone, or may be widespread throughout the building.”

bottom of page