top of page
  • Instagram
  • LinkedIn

Top Pitfalls in Existing Building Due Diligence—and How to Avoid Them

  • Writer: Lucas Giacalone
    Lucas Giacalone
  • Feb 7
  • 2 min read

Introduction

Performing due diligence on existing buildings is a critical step for commercial real estate (CRE) developers and lenders. Without a thorough evaluation, unexpected costs, compliance issues, and structural challenges can derail investments. In this post, we’ll explore the most common pitfalls in existing building due diligence and strategies to avoid them.


Building inspection team reviewing blueprints and maintenance logs during a due diligence evaluation by KOW Building Consultants.

Common Pitfalls in Existing Building Due Diligence


1. Skipping a Comprehensive Document Review

Many evaluations focus only on physical inspections, overlooking critical documentation such as building permits, certificates of occupancy, and maintenance records.


Avoid It By:

  • Reviewing past permits, warranties, and zoning documents.

  • Verifying compliance with local regulations and building codes.

  • Examining utility records for hidden issues.


2. Failing to Assess Deferred Maintenance

Older buildings often have deferred maintenance issues that may not be immediately visible, leading to costly repairs later.


Avoid It By:

  • Conducting detailed visual inspections for signs of wear and tear.

  • Requesting repair histories and maintenance logs.

  • Engaging specialists for roofing, HVAC, and plumbing reviews.


3. Overlooking Environmental Concerns

Environmental risks, such as asbestos, lead paint, and underground storage tanks, can pose significant liabilities.


Avoid It By:

  • Ordering Phase I Environmental Site Assessments (ESAs).

  • Following up with Phase II testing if red flags emerge.

  • Reviewing records of prior environmental remediation.


4. Misjudging Structural Integrity

Undetected structural issues can lead to expensive retrofits or delays in occupancy.


Avoid It By:

  • Engaging structural engineers to evaluate foundations, beams, and load-bearing walls.

  • Identifying cracks, water damage, or evidence of settling.


5. Neglecting Mechanical and Electrical Systems

Older systems may be outdated, inefficient, or at risk of failure, leading to operational disruptions.


Avoid It By:

  • Testing HVAC, plumbing, and electrical systems.

  • Reviewing upgrade histories and maintenance logs.

  • Budgeting for modernization if needed.


Why Thorough Due Diligence Matters

Investing in due diligence can:

  • Reduce Risks: Identify potential liabilities before closing.

  • Support Negotiations: Provide leverage for price adjustments or repairs.

  • Improve Planning: Inform renovation or upgrade budgets.

  • Ensure Compliance: Avoid legal and environmental penalties.


How KOW Building Consultants Can Help

At KOW Building Consultants, we provide tailored due diligence services to help CRE developers and lenders evaluate existing properties with confidence.


Our Services Include:

  • Detailed building inspections and visual assessments.

  • Review of permits, compliance documents, and repair histories.

  • Environmental evaluations and Phase I ESA inspections and reports.

We deliver actionable insights that empower stakeholders to make informed decisions.


Contact Us Today

Ready to streamline your due diligence process? Contact KOW Building Consultants today to schedule your building evaluation.


Our Office Locations

We proudly serve clients nationwide with offices in:

  • New York, NY

  • Rochester, NY

  • Queensbury, NY

  • State College, PA

  • Annapolis, MD

  • Boston, MA

  • New Jersey

  • Washington, DC

  • Charleston, SC

  • Greensboro, NC

  • Palm Coast, FL

  • Palm City, FL

  • Columbus, OH

  • Chicago, IL

  • Austin, TX

  • Sacramento, CA

  • San Diego, CA

  • Denver, CO

  • Nashville, TN


Conclusion

Avoiding common pitfalls during existing building due diligence can save time, money, and stress for CRE developers and lenders. By prioritizing comprehensive evaluations and expert guidance, stakeholders can reduce risks and maximize the value of their investments.

Partner with KOW Building Consultants to simplify and strengthen your due diligence process today.

 
 
 

Comments


bottom of page