An assessment of all observable site and building components, thus helping to determine both the current condition of all components and categorize future capital improvement estimates into critical, immediate, short-term, and long-term estimations. At your request, this report can be written in accordance with ASTM, HUD Mark to Market, Freddie Mac, or other specific guidelines.
-
Site work (topography, storm water drainage, access, egress, paving, curbing, parking, flatwork, landscaping, recreational facilities)
-
Utilities (water, electricity, natural gas, sanitary sewer, storm sewer, special utility systems, on-site generation)
-
Structural Frame and Building Envelope (foundation, building frame, facades, parapets, water penetration issues, windows, skylights)
-
Roofing (material, condition, drainage, flashing, coping, issues)
-
Plumbing (age, piping supply, drain/waste/vent, domestic water production, fixtures)
-
HVAC (heating plant, fuel sources, storage tanks, pumps, distribution systems, controls, rooftop units, issues)
-
Electric System (building power, fixtures, emergency power, emergency fixtures, fire alarm, GFCI, issues)
-
Elevators – (number of cabs, controls, equipment)
-
Fire Safety (system types, smoke detection, alarm)
-
Apartment and common area interiors (finishes, conditions, issues)
-
Handicapped accessibility
GET A QUOTE
Tell us about your next project