top of page
  • Instagram
  • LinkedIn

Kenneth F. Wille, PE, LEED AP BD&C, CEM, GBE

President and CEO

Kenneth F. Wille, PE, LEED AP BD&C, CEM, GBE

Kenneth F. Wille is a visionary leader and distinguished Professional Engineer licensed in New York, Connecticut, Maryland, and Florida. As the President and CEO of KOW Building Consultants, he brings over 20 years of exceptional experience in construction consulting, affordable housing, and building performance. His dedication to quality, innovation, and sustainability has established him as a trusted authority in the industry.

With a career marked by impactful achievements, Mr. Wille has performed thousands of site observations for construction and renovation projects, reviewing payment applications, conducting shop drawing reviews, and analyzing change orders. He has completed hundreds of Property Condition Assessments, adhering to ASTM E2018 standards, and contributed to HUD-financed retrofits as well as Fannie Mae and Freddie Mac projects. His portfolio also includes hundreds of Plan and Cost Reviews, ensuring comprehensive cost analysis, compliance with building codes, and project feasibility.

A champion of sustainability, Mr. Wille has conducted energy audits, including blower door tests, combustion analyses, lighting evaluations, and flow tests, and has worked on many Phase I and II Environmental Site Assessments under ASTM standards. As a pioneer in resiliency and green building, he played an instrumental role in the development of HUD Green Retrofit Program guidelines and the HUD Green Mark-to-Market requirements.

Mr. Wille is also a dynamic presenter and thought leader in the industry. He has conducted numerous seminars for clients, participated in countless conference panels and presentations, and authored articles for leading trade publications. His contributions to the field extend to standards development, as he serves on the ASTM Committee preparing guidelines for Requisition Inspections.

Under his direction, KOW Building Consultants has grown from a small two-person operation to a nationally recognized firm with a robust environmental and construction consulting footprint, tripling its sales within three years.

Certifications and Licenses:
Mr. Wille holds an extensive range of certifications that exemplify his expertise:

Engineering Licenses: PE in NY, CT, MD, and FL
Green Building and Sustainability: LEED AP BD&C, Certified Energy Manager (CEM), Green Building Engineer (GBE), Existing Building Commissioning Professional (EBCP), Green Pro Certified, and NYC Healthy Homes Certified
Construction and Safety: Certified Commercial Mold Inspector, Certified Lead-Based Paint Subcontractor, ASTM Phase I & II and PCR Trained, OSHA 10-Hour and 30-Hour Certified
NYC-Specific Credentials: TR8 Inspector and Qualified Construction Superintendent
Education:
Mr. Wille earned dual degrees from Penn State University, with a Bachelor of Science in Civil Engineering and a Bachelor of Science in Management. Additionally, he is an honored member of the Order of the Engineer, exemplifying his dedication to professional ethics and excellence.

With a career underpinned by technical precision, strategic vision, and a commitment to innovation, Kenneth F. Wille continues to set the standard for excellence in construction consulting and sustainable building practices.

bottom of page